欧美人与禽交ZOZO,老外和中国女人毛片免费视频,国产aa免费视频观看网站,国产制服91一区二区三区制服,欧美曰韩日B大片在线看
試壓泵產(chǎn)品分類
本頁位置>>主頁>>企業(yè)動態(tài)>>太陽能電動試壓泵國外客戶技術(shù)要求新聞內(nèi)容

太陽能電動試壓泵國外客戶技術(shù)要求

來源:本站 添加時間:2015/12/15 17:28:18

太陽能電動試壓泵國外客戶技術(shù)要求

太陽能電動試壓泵是由一個12V直流電機供電,而不需要外部電源。通過利用太陽能,AGM高速密封鉛酸電池連續(xù)充電,使電池全天候提供能量的化學注射泵¬Tor。設(shè)計的系統(tǒng)能夠可靠運行在最大音量上每天*少3.6的“太陽時間可以長達5天的電池電源僅**。太陽能電動試壓泵的可靠使用注射器頭,標準的3 / 8“直徑的不銹鋼柱塞。可在單或雙頭結(jié)構(gòu)鋼(標準)或316不銹鋼封頭的腐蝕保護。抽水量,由XXX的自定義定時器控制,可以從1到5加侖每天有單頭和10加侖/日雙頭范圍。抽油量均勻地分散在24小時內(nèi)。3 / 8“柱塞允許泵壓力高達1200磅(磅每平方英寸)。柱塞最大不¬充氣壓力最大抽水量單頭雙頭3 / 8“1200磅5 GPD 10gpd

 XXX Solar Powered Chemical Injection Pump

Ø        The xxx-xxx Solar Powered Chemi­cal Injection Pump is powered by a 12VDC motor, but requires no external power source. Through use of solar energy, an AGM high-rate sealed lead acid battery is continuously recharged, allowing the battery to provide around-the-clock energy to the chemical injec­tor pump.

Ø        The system has been designed to reliably operate at maximum volume on as little as 3.6 ‘Sun-hours per day’* and can operate up to 5 days on battery power alone.**

Ø        The XXX-xxx uses XXX’s reliable injector heads, standard with 3/8" diameter stainless steel plunger.

Ø        Available in either single or double head configurations with steel (standard) or 316 stainless steel heads for corrosion protection.

Ø        The pumping volume, controlled by XXX’s custom timer, can range from 1 to 5 gallons per day with a single head and up to 10 gallons per day with dual heads. The pumping volume is dispersed evenly over a 24 hour period. The 3/8" plunger allows for pumping pressures up to 1200 psi (lbf per square inch).

PLUNGER

MAXIMUM

DIS­CHARGE PRESSURE

MAXIMUM PUMPING VOLUME

SINGLE HEAD

DOUBLE HEAD  

 

3/8"

1200 PSI

5 GPD

10GPD

 


ELECTRICAL SYSTEMS

The electrical panel contains two female quick-connectors (XXX-1294). One will be joined to the solar panel wires and comes directly out of the SunSaver Solar Controller “Solar” terminals, marked “4” and “3”. The other one will be joined to the motor wires and has an inline fuse placed in its positive wire. The electrical panel also contains three ring terminals that will connect to the positive (+) terminal of the battery and two ring terminals that will connect to the negative (-) terminal of the battery.

ELECTRICAL CONTROL PANEL

OPERATION

PUMPING VOLUME

Pumping Volume is controlled by XXX’s

XXX‑1240 Timer and Switch Bank. The timer is

pre-programmed for a range of pumping volumes

from 1 gallon per day (GPD) up to 10 gallons per

day. Two undefined program slots are available,

should you require a daily pumping volume not

pre-programmed into the unit. (This will need to be

done by XXX Engine Company prior to shipping

of the unit.)

Pumping volumes are selected by using the

bank of four switches and setting them in a combination

of ‘UP’ (1) and ‘DOWN’ (0) positions. The

table shows pumping volumes for either single

head pump or dual head pump configurations,

along with the appropriate combination of switch

selections.

The timer operates on a preset ON/OFF cycle,

programmed to inject the selected volume evenly

over a 24 hour period. The ON time is divided

evenly every minute to provide the selected GPD

of volume. For example, for a double head unit with

the switch bank set to 0000 (all switches down),

the pumping volume will be 10 gallons injected

over a 24 hour period, and the pump will operate

ON for 5.62 seconds, then OFF for 54.38 seconds

every minute.

VOLTAGE

The XXX timer also has a built-in function to monitor battery voltage and adjust the pump run time should the voltage begin to decrease (i.e. in the rare case that there is a prolonged period with low amounts of sunlight). This prevents the battery from fully discharging (prolonging battery life), and allows for the battery to have longer recover times in between motor operations. This allows pumping to continue at decreased volumes without complete shut-down. There is, however, a complete shutoff setting should the battery voltage. drop below 9.8 volts. This is to prevent the motor from overheating. Normal operation will resume once the battery voltage recovers to a safe level for motor operation.

There are four (4) modes of operation: Full Vol­ume, ¾ Volume, ½ Volume, and Off. The Voltage Transitions Hysteresis Diagram shows the timing and battery voltage operation with the transition points. Hysteresis is provided to prevent oscillation around the transition points while changing from mode to mode.

Orientation

Your solar panel should be oriented direction­ally so that it faces True South. These orientation guidelines are intended for installations located in the Northern Hemisphere. If your installation is in the Southern Hemisphere, the directional position­ing and season adjustment should be reversed.

GENERAL ORIENTATION

The general convention, and an efficient orien­tation, is to set the angle of tilt of your solar panel equal to the degree of latitude from horizontal of your installation during the Spring and Autumn months, adding 15° of angle (from horizontal) in the Winter, and subtracting 15° of angle (from hori­zontal) in the Summer.

OPTIMIZED ORIENTATION

An additional 3-5% of solar efficiency can by achieved by using the following orientation method.

1. The Spring and Autumn orientation angle from horizontal is equal to the degree of latitude of your location minus (-) 2.5°.

2. Calculate the Winter orientation angle from horizontal using the formula:

Solar Panel Angle = (Latitude * 0.9) + 29°

3. The Summer orientation angle is 52.5° less than the Winter angle.

Maintenance

GENERAL

The Solar Panel should only require minimal maintenance. Adjust the angle of orientation according to the time of year. Keep the panel free of snow and other debris, periodically wiping the surface to keep it clean. This will maximize the energy transferred from the panel to the battery.

ADJUSTING AND REPLACING HEAD, PLUNGER, & PACKING

Although the pump and motor unit comes completely assembled, periodic adjustment may be neces­sary. After time, it may be necessary to replace some of the internal components. Additionally, head, plunger, and packing replacement will be necessary, as these components are in contact with harsh chemicals.

     

 

 

 

首頁  |  關(guān)于我們  |  產(chǎn)品展示  |  經(jīng)典客戶案例  |  企業(yè)動態(tài)  |  產(chǎn)品知識  |  客戶解決方案  |  聯(lián)系我們
版權(quán)所有 四川思凱達機械設(shè)備有限公司   地址:四川省成都市高新區(qū)永豐路24號
公司總機:028-82448381   售后電話:028-82448381   傳真:028-85114327;
試壓系統(tǒng)技術(shù)咨詢:18980419018
欧美人与禽交ZOZO,老外和中国女人毛片免费视频,国产aa免费视频观看网站,国产制服91一区二区三区制服,欧美曰韩日B大片在线看